Kingswood Parks

Kingswood Parks Primary School

Sector

Education

Client

Kingswood Parks Primary School

INSTALLATION TIME

1 week

Hire period

140 weeks

BUILDING SOLUTION

Hire

The classrooms have been a nice blank canvas, which have allowed us to develop our areas of learning


Claire Davies

Foundation Stage Leader


BRIEF

With a new school under construction, Kingswood Parks Primary needed a temporary solution that students could settle into quickly, with disruption kept to a minimum. Due to our reputation for our high-quality interim solutions and speed of delivery, we were appointed to tackle their need for additional space.

The CHALLENGES

• As an active school site, pupil safety was paramount.

• To minimise disruption, we worked closely with school leaders to ensure our programme of works fit with term times.

• Our temporary classrooms needed to reflect the quality learning space of the new school to keep children and parents engaged.

The SOLUTION

Three temporary teaching blocks, comprising a total of five classrooms were arranged on site to allow easy access for pupils, whose safety was paramount during new building works. A mix of 12.2m and 9.6m modules created a spacious learning environment, alongside stores, cloakrooms and toilets. Disabled access and toilet facilities were also provided.

Installed on site within a week, the facility was in use by pupils within a few days of completion


the results

Our solutions were the perfect fit for these temporary classrooms, configured in line with the school’s needs to create a welcoming space for pupils.

Both children and teachers settled in to the new classrooms with minimum disruption, so learning continued as normal whilst their new school was being built.