BRIEF
Rapid expansion and growth meant that Mission Grove Primary School needed to develop their facilities as quickly and cost-effectively as possible. The school were keen to expand their offering but needed bespoke and innovative solutions to do so. Situated on a busy main road, the team were challenged with creating bespoke ventilation systems to combat noise and traffic pollution.
THE CHALLENGES
An existing building needed to be demolished, with minimum on-site disruption.
Situated on a busy road, bespoke ventilation systems were required.
As an urgent requirement, production and build time needed to be kept to a minimum.
THE SOLUTION
The project lent itself to our innovative, time-saving solutions and together with Mansell Construction Services, we delivered the build within a tight timeframe of 11 weeks.
Expanding the school also meant the demolition of an existing building, enabling us to create the space for a brand-new two storey modular structure.
An external terraced play area meant that children could enjoy more outdoor activities and quiet spaces provided private study environments for pupils to take advantage of.
RESULTS
Creating new environments and additional space for learning, we ensured that Mission Grove Primary benefitted from our quick turnaround and build times. Knowing that noise and traffic pollution were a key concern, we created a unique and intelligent ventilation system to ensure a safe and inspiring learning environment.
High spec aluminium windows alongside a specialist Trespa cladded panel and render, ensured a modern and seamless finish for the school to be proud of.