News
|
|

Premier Awarded its Largest Offsite Healthcare Project – A £21m Contract at King’s College Hospital


Premier has been awarded its largest offsite project in the healthcare sector to date – a £21m contract for a new outpatient services facility at King’s College Hospital.

Premier Modular, one of the UK’s leading offsite specialists, has been awarded a £21m contract to construct a new outpatient services building at King’s College Hospital in London. The 3,450sqm, four-storey scheme is Premier’s largest healthcare project in its 65-year history.

Constructed offsite, this large-scale building will allow the Trust to free up space within the main hospital to help reduce waiting times and improve the patient experience for urgent care services.

As main contractor, Premier will be leading the project team which includes delivery partner Claritas, P+HS Architects, and M&E specialists, TClarke. Awarded under the Crown Commercial Service modular buildings framework, the project follows the team’s successful delivery of a £10m contract for the offsite construction of a 62-bed Priority Assessment Unit at St Peter’s Hospital in Chertsey.

The new outpatient services building at King’s College Hospital will provide 48 purpose-designed consultation rooms and eight procedure rooms for a range of services, including dermatology, rheumatology, respiratory, neurosciences, pain management, and urology as well as other aspects of surgery and therapies.

Dan Allison, Divisional Director at Premier Modular, said, “The use of an offsite solution for this project will ensure faster delivery and earlier occupation, to the benefit of patient care.”

“Offsite construction is safer, quieter and cleaner than in-situ construction, which will radically reduce disruption during the build phase to staff and patients, and the surrounding residential community. This type of building solution is also enormously beneficial on restricted hospital sites such as this, reducing the amount of plant, materials, and vehicle movements to site by undertaking as much work in the factory as we can. The new building has access roads to three sides and is immediately adjacent to the Normanby Building.”

“We are working to a short programme to bring these state-of-the art facilities into use as early as possible this year, to the benefit of patients and to assist with the rising demand for hospital services.”

Stephen Hatcher, Associate at P+HS Architects, said, “The building is designed to minimise impact on the environment over its life and is targeting a BREEAM excellent rating. It will have areas of green roof to encourage biodiversity, a highly insulated building fabric to reduce heat loss and running costs, energy-efficient ventilation and electric air source heat pump system for heating, and solar panels for electricity generation.”

The façade design will be contemporary and was informed by the existing buildings on the hospital campus. A double-height feature entrance will provide visibility externally and allow high levels of natural light for the reception and waiting area.

Developed in collaboration with clinicians and patient representatives, the interior design will be crisp and modern, whilst assisting patients with sensory needs. To maintain patient flows, the new facility will be linked to the Normanby Building at ground floor level.

Premier Modular is providing a full turnkey construction package for this project including engagement with the clinical team at the design stages, development of a highly sustainable M&E strategy, demolition of an existing building on the site, groundworks, offsite manufacture, module installation, and fitting out.

Leave a Comment

Learn more about why Premier Modular is the right partner for your next project

Recent News

2024 – A year in review

We can’t believe that it’s already the end of another successful year. We’re taking a look back and recapping some of our highlights.

David Harris Premier Modular

In conversation with David Harris

And just like that 2024 is over. As we move into what is set to be another exciting year, we take a step back and reflect on the past 12 months. Putting questions to our CEO, David Harris, he looks back on the year’s proudest achievements, greatest challenges, and highlights what’s coming up next.

Financing modular buildings

Five top tips to navigate financing your Modular building project

Modular construction is rapidly gaining popularity as a flexible and efficient solution for building projects. Navigating the funding landscape for modular building projects can be complex, so it’s essential that you have a good understanding of all the options available for both permanent and rental buildings.