News
|
|

Premier Modular Achieves Zero Waste to Landfill in its Offsite Manufacturing Processes


Premier has set up systems and procedures for recycling in its factories to ensure that no waste is sent to landfill as a result of its offsite manufacturing operations.

Premier Modular, the UK’s leading offsite specialist, achieved zero waste to landfill in 2020.

We have worked closely with our waste management partners, ACM, to set up new systems and procedures for recycling to ensure that no waste is sent to landfill as a result of our offsite manufacturing operations.

The speed and quality benefits of offsite construction are well documented, but reducing the impact of construction on the environment is another important reason to choose offsite construction.

In addition to achieving zero waste in manufacture, offsite construction radically reduces vehicle movements to site so there is less congestion, and it reduces material waste and damage on site.

The greater precision of offsite manufacture also means construction to very accurate tolerances, which reduces air permeability and heat loss from the finished buildings. This results in less energy consumption to heat a building and the associated reductions in carbon emissions.


How we Achieve Zero Waste

  • Wood is collected, shredded and used for biomass fuel at a local power station
  • Plasterboard offcuts are sent to a plasterboard recycling specialist to be turned back into plasterboard
  • Cardboard is pulped for paper manufacture
  • Polythene is washed and processed into pellets which can be turned into a variety of products including polythene
  • Food waste is taken to an anaerobic digestion facility where the gases are extracted to generate electricity and any remaining food is used on agricultural land for the growing of arable products such as wheat and oil seed rape.
  • Any general waste that cannot be recycled is used for Refuse Derived Fuel which means it is incinerated for electricity generation.

Leave a Comment

Learn more about why Premier Modular is the right partner for your next project

Recent News

2024 – A year in review

We can’t believe that it’s already the end of another successful year. We’re taking a look back and recapping some of our highlights.

David Harris Premier Modular

In conversation with David Harris

And just like that 2024 is over. As we move into what is set to be another exciting year, we take a step back and reflect on the past 12 months. Putting questions to our CEO, David Harris, he looks back on the year’s proudest achievements, greatest challenges, and highlights what’s coming up next.

Financing modular buildings

Five top tips to navigate financing your Modular building project

Modular construction is rapidly gaining popularity as a flexible and efficient solution for building projects. Navigating the funding landscape for modular building projects can be complex, so it’s essential that you have a good understanding of all the options available for both permanent and rental buildings.